Skip to main content

Autodesk Project Lifecycle Management Suite

by Autodesk

Data and process management that adapts to your business

Visit website

Media

www.autodesk.com
Autodesk Project Lifecycle Management Suite - website image

About This Product

The Autodesk Project Lifecycle Management Suite is a subscription-based software platform that integrates Product Data Management (PDM) with cloud-based Product Lifecycle Management (PLM) to support project execution. It serves construction and engineering teams by offering tools for digital takeoffs, change order management, scheduling, and energy modeling alongside document control and reporting capabilities.

Capabilities

How this product is delivered and what's included out of the box.

Mobile app
Available
Free trial
Yes
Free tier
Yes
Public API
Yes
Deployment
Cloud

Trust & Privacy

Each statement below was extracted directly from the vendor's privacy policy or terms of service. Click "source" to read it in context.

Data export available on request

"To request a copy of the personal data in your account, please"
Confidence: medium Source

Data deletion honored on request

"You can also delete your personal data and close your account."
Confidence: high Source

Primary policy document: https://www.autodesk.com/company/legal-notices-trademarks/privacy-statement

FSH Score Breakdown

Ease of Use
5.0
Features
8.0
Support
5.0
Value
5.0
Integrations
8.0
AI Capabilities
1.5

Features

150 features confirmed across 17categories· Showing confirmed capabilities only

Platform & Customization51features

Custom API Accessextend core software functionalityCustom Scripting Supportcustom scriptingDesign CollaborationIntegrated designDocument ManagementDocumentationForma BoardIntegrated Data Management and PLMProduct data management (PDM)Single Sign-OnSingle sign-on (SSO)Supply Chain CollaborationSupply chain collaboration
Show 43 more
Visual Configuration EditorVisual configuration editorNew Product Development (NPI/NPD)New product development (NPI/NPD)Sandbox AccountSandbox environmentRequirements ManagementDispatch Or FSM Software IntegrationSoftware Integrations2D to Full 5-Axis MachiningAdditive Manufacturing WorkflowsAutomated CAM ProgrammingAutomated Document Review WorkflowsBIM Platform InteroperabilityBIM Project Delivery and CoordinationBusiness Process BlueprintsCentralized Database ManagementChange and Release ManagementCustom IntegrationDirectory SyncDisplay SystemDisplay SystemForma Data ManagementIn-Process Part Inspection and ProbingIntegrated CAD, CAM, CAE, and PCBModular ProcessesParametric ComponentsProcess ManagementReal-Time System-Wide Data SharingRenovation ModeCustom Fieldsfiltered picklistsData ImportIFC improvementsApproval ManagementProcess managementCustom BrandingCustom integration buildingThird-Party IntegrationInteroperabilityJob Management Platform Integrationexternal system integrationBIM Content ManagementProduct data managementBIM IntegrationIntegrated CAD/CAMChange ControlChange and release managementData ExportMAJ file exportNo-Code Integration PlatformNo-code integration platformThird Party Participant AccessCustom TemplatesConfigurable templatesConnected Support FilesConnected Support FilesDrag And Drop Form BuilderForma Site DesignVisual Workflow DiagrammingVisual workflow diagrammingCustom Software ProgrammingAutomated CAM programmingBack Office Data SyncData synchronization across 300+ SaaS applications

Estimating & Quoting30features

Quoting & EstimatesBid ManagementAssembly BuilderDetail Component ManagerBIM ToolsFabricationChange OrdersChange managementDesign Document GenerationGeolocated Revit project generationDigital TakeoffDigital TakeoffsSystem DesignInformed Design for RevitDesign Document And Proposal ExportGeolocated Revit project export
Show 22 more
Sheet Metal Designsheet-based nesting and fabricationArchitectural Component Library8,800+ architectural componentsCAE (Computer-Aided Engineering)CAMDesign Build Drawing CapabilityEstimates from Revit ModelsForma Building DesignForma Site DesignMAJ File ExportQuick Select Property SetQuick Select Property SetSheet-Based Nesting and FabricationStructural Member Coordinate ExportSupport for Layer StandardsSupport for layer standardsWalls, Doors, and Windows with Real World BehaviorAutoCAD IntegrationMulti-CAD integrationsAutoCAD GenerationGeolocated Revit project conversion3D Building and Infrastructure Design3D designAutomated DrawingsAutomatic object generation3D CAD3D CADDrawing Version ComparisonDynamic 3D Modeling And VisualizationAI Powered Design Automations for Site and Massing CreationAI-powered site massing creationSpecification EditorVisual configuration editor

AI & Automation12features

Automation RulesautomationConfigurable WorkflowsConfigurable workflowsAI SupportAutodesk Assistant (AI)AI Assistant (ADP Assist)AI AssistantsAI Powered Environmental AnalysisAI Powered Site AnalysisAI-powered site planningCreate, Design and Manage Workflows for Repetitive Tasks
Show 4 more
No Code Workflow AutomationAI Feedback AnalysisAnalysisAI Plan ReviewCollaborative visual workspace for design reviewAI Powered OptioneeringAI-powered optioneering

Compliance & Safety10features

Acoustic ModelingSite context analysisDecarbonization TrackingEmbodied carbon analysisEnergy ModelingSun hours analysisQuality ManagementQuality managementSun Hours AnalysisSun hours analysisDOE Energy SimulationsimulationIncident ManagementCentralized issue managementQuality ControlQuality management
Show 2 more
CFD (Computational Fluid Dynamics) Analysis11 advanced simulation studiesManual J CalculationsAI-powered optioneering

Reporting & Analytics8features

ReportingReportingAnalyticsAnalysis with InsightEconomic AnalysisEnvironmental analysisKPI DashboardsDesign Documentation And ReportingHVAC design and documentationExecutive DashboardMap Based Data VisualizationEnergy Efficiency Project AnalysisEnvironmental analytics and simulation

Technician Management7features

Automated Quality AssuranceInterference detectionLicense ManagementExpense managementTime TrackingTime trackingTraining CoursesArtificial IntelligenceTechnician CoachingExpert coaching and learning plansInternal Employee CommunicationReal-time team collaborationSubcontractor ManagementSupply chain collaboration

Scheduling & Dispatch6features

SchedulingSchedulesGantt ChartsGantt chartsProject ManagementTask managementJob Stage TrackingPhasingReal-Time Task ViewsPortfolio and Program ManagementProduct portfolio management

Equipment & Asset Management6features

Equipment TrackingmanufacturingPower ManagementProduct portfolio managementProduct RegistrationNew product introductionAsset ManagementIntegrated data management and PLMBulk Device ConfigurationVisual configuration editorEvent Setback ManagementRenovation mode

Inventory Management4features

Inventory ManagementBill of materials (BOM) managementBill Of Materials ManagementBill of materials (BOM) managementBill Of MaterialsBOM managementProduct Lifecycle ManagementProduct data management (PDM)

Mobile & Field Tools3features

AR VisualizationTwinmotion for RevitLiDAR IntegrationPoint cloud toolsDigital FormsForma Data Management

Training & Education3features

Simulation-Based TrainingsimulationBlog & ArticlesconstructionHVAC Electrical FundamentalsParametric components

Invoicing & Payments2features

Price BookCost DatabasesMilestone TrackingPhase-gate milestone tracking

Customer Communication2features

Customer Support24/7 supportCall RoutingChange management

CRM & Sales2features

CRMCRMContract ManagementSupplier collaboration

Accounting Integration2features

Job CostingCost ManagementAccounting IntegrationEnterprise integrations

Hardware Features1feature

Smart Home IntegrationRenovation mode

Fleet & GPS Management1feature

GPS TrackingGeolocated Revit project export

Integrations 20 across 2 categories

Productivity 14
Advance Steel

Advance Steel

AutoCAD Civil 3D

Civil 3D

Autodesk Docs
Autodesk Revit

Revit

Autodesk Vault
Box

Box

Dropbox

Dropbox

Dynamo
Google Drive

Google Drive

Microsoft SharePoint

SharePoint Online

Rhino

Rhino

SketchUp

SketchUp

Twinmotion
Upchain
Field Service 6
Autodesk Build Insight

Insight

Autodesk Construction Cloud

Autodesk Construction Cloud

Autodesk Forma Board

Forma Board

Autodesk Forma Build

Forma Build

Autodesk Forma Building Design
Autodesk Tandem for AEC

Pricing

Model
Subscription
Starting at
Contact for pricing